We – EPG Team the bigge EPT gearbox & motors , vee pulleys, timing pulleys, couplings and gears manufacturing facility in China with 5 diverse branches. For a lot more information: Cell/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828
Hot Sale! 29m 33m hydraulic jack-up concrete placing growth/self-climbing concrete placing growth/concrete growth placerHot Sale!
Tower Column hydraulic jack-up concrete inserting growth, Self-climbing kind, climbing by flooring body or by shaft body. Primarily utilised for concrete positioning of construction undertaking, which includes civil development, plant building, bridge construction, beam garden, nuclear electrical power plant, infrastructure, etc.
Charactics
Modular design and style, mechanical and electrical integration handle, folding boom, tube column, floor frame and shaft frame. Integration of superior features and product diversification, to attain a increased solution portfolio, enhance the applicability of the item.
Imported hydraulic and electrical components, undertake top quality fa EPT coupling for hydraulic pipelines, which is converted quickly, it can properly fix the issue of oil leakage in the process of assembling and dismantling, and avoid the pollution of the setting. Safety and trustworthiness
sections R variety hydraulic increase, large circular arc, novel and gorgeous appearance, compact framework, and the light-weight layout of the increase, which reduced the fat of the whole machine..
Effortless to transport and set up.
Outfitted with self-climbing frames which are driven by hydraulic and which climb up immediately from the current ground to the sought after flooring together the holes at first ready in elevator well, the placing booms rise with the increasing flooring, preserving time and labor.
Characteristics
A.Boom
The arced boom structure is optimized by applying CPU design. The boom adopted high-strength steel plate for production with scientific process. It features beautiful appearance, superior rigidity and intensity, ensuring excellent and reliable quality.
B. EPT program
C series products adopted Germany Rexroth solenoid directional control valve and balance valve
with secondary overflow. It has effectively avoided the potential damages of boom
which might be caused by over speed movement when the boom drops down, and sudden
increase of oil cylinder’s pressure under external forces, thus the reliability of the boom
has been increased.
C.Interior EPT Oil Tank
Inner hydraulic oil tank renders a compact structure and free swivel. It gives big
convenient for installation, dismounting and maintenance, which ensure longer service
life and excellent performance.
D.Climbing Facility
As a rectangular frame structure, the climbing facility is flexible, reliable and convenient
for dismounting.
E.Slewing System and Reducer
Slewing reducer adopted products made by the world famous brand of Italy Comer, with
a great torsion. Being accompanied with the integrated slewing balance valve made by
Germany Hawei, it achieves smooth operation and reliable and stable performance.
F.Wi-fi Distant Controller
C series products adopt industry-exclusive analogue wireless remote controller made by ZheJiang TELECRANE, which is easy and convenient to operate, highly resistant to
disturbance and reliable in performance.Each series are accompanied with wired remote controller for use in necessity.
G.Electric Control Technique
The electric control system adopted world famous brand of electric components, such
as Japanese Omron and French Schneider. The multi automatic protection is set up in
the control program, so as to avoid misoperation and ensure the system’s reliability.
H.Column
The column is made of high-strength steel plate in square shape, with nice appearance,
rigidness and intensity, as well as high reliability.
Selection:
u Inner-climbing frames: Floor frames or Wall frames(Shaft frames)
u Column: 2m-10m.
u Mode of slewing: Gear slewing or rack & Bearing of stepless slewing.
u Voltage: 380V/50Hz or 440V/60Hz
u Radio distant Management: Tele Crane HBC or AUTEC
29m Tower Jack-up Concrete Positioning boom Requirements:
Model | Models | HGY29C | ||
Performance | Max.radius of positioning boom | m | 28.9 | |
Freestanding peak (to the joint amongst the finish of the growth and swivel desk) | m | 22.7 | ||
Boom articulation | ° | 400 | ||
Slewing brake | / | often near | ||
Working temperature | ºC | 0ºC~60ºC | ||
Total weight | kg | 19100 | ||
Counter fat | kg | Have no | ||
Power | / | 380V/50HZ | ||
Motor | Model | / | Y2-160M-4 | |
Power | kW | 11 | ||
EPT technique |
Pressure | MPa | thirty | |
Flux | l/min | eighteen | ||
EPT oil |
Circumstance temperature 35ºC-50ºC | / | L-HM 68 | |
Circumstance temperature 5ºC-35ºC | / | L-HM forty six | ||
Circumstance temperature -15ºC-5ºC | / | L-HM 32 | ||
Control mode |
/ | Short-haul Control /radio remote handle | ||
Pipeline cleaning | / | Moist cleaning/Dry cleansing |
||
Structure of tower human body | / | Tubular column | ||
Section of tower body | m×m | .75×0.75 | ||
Boom |
Shape | / | A few hydraulic foldable arms | |
Inner diameter of pipeline | mm | DN125 | ||
End hose | ″×mm | 5″×3000 | ||
1 EPT part | Size | m | 11.five | |
Articulation | ° | 0°~82.5° | ||
2nd part | Length | m | nine.three | |
Articulation | ° | 0°~180° | ||
3rd part | Size | m | 8.one | |
Articulation | ° | 0°~180° | ||
Climbing |
Climbing mode | / | By hydraulic cylinder climbing |
|
Interval of climbing | m | .fifty two | ||
Floor frame | / | Hole geared up in flooring |
||
Shaft body | m | Hole geared up in flooring two.~2.7 |
||
Min.Interval of climbing body | Climbing | m | three. | |
Placing concrete | m | 6. | ||
Rest | m | 6.0 |
29m Inserting BoomWorking Selection :
33m Tower Jack-up Concrete Putting increase Specifications:
Model | Models | HGY33E | ||
Performance | Max.radius of inserting growth | m | 33 | |
Freestanding top (to the joint amongst the stop of the increase and swivel table) | m | 22.7 | ||
Boom articulation | ° | four hundred | ||
Slewing brake | / | usually close | ||
Working temperature | ºC | 0ºC~60ºC | ||
Total weight | kg | 21200 | ||
Counter weight | kg | Have no | ||
Power | / | 380V/50HZ | ||
Motor |
Model | / | Y2-160L-four | |
Power | kW | fifteen | ||
EPT method |
Pressure | MPa | thirty | |
Flux | l/min | 18 | ||
EPT oil |
Circumstance temperature 35ºC-50ºC | / | L-HM 68 | |
Circumstance temperature 5ºC-35ºC | / | L-HM forty six | ||
Circumstance temperature -15ºC-5ºC | / | L-HM 32 | ||
Control method | / | Quick-haul Control /radio distant manage | ||
Pipeline cleansing | / | Damp cleansing/Dry cleansing |
||
Structure of tower entire body | / | Tubular column | ||
Section of tower human body | m×m | .75×0.seventy five | ||
Boom |
Shape | / | A few hydraulic foldable arms | |
Inner diameter of pipeline | mm | DN125 | ||
End hose | ″×mm | 5″×3000 | ||
1 EPT part |
Size | m | 12.38 | |
Articulation | ° | 0°~eighty two.5° | ||
2nd section | Duration | m | 10.ninety three | |
Articulation | ° | 0°~180° | ||
3rd section |
Size | m | nine.69 | |
Articulation | ° | 0°~180° | ||
Climbing |
Climbing manner | / | By hydraulic cylinder climbing | |
Interval of climbing | m | .52 | ||
Floor frame | / | Hole ready in flooring | ||
Shaft frame | m | Gap well prepared in floor two.~2.seven |
||
Min.Interval of climbing frame | Climbing | m | three. | |
Putting concrete | m | six. | ||
Relaxation | m | six.0 |
33m Placing BoomWorking Assortment :
Tower Column Concrete Putting Boom Set up:
Tower Placing Boom Job web site Performance:
We – EPG Group the bigge EPT gearbox & motors , vee pulleys, timing pulleys, couplings and gears factory in China with 5 various branches. For more specifics: Cellular/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828 The use of original tools manufacturer’s (OEM) part figures or trademarks , e.g. CASE® and John Deere® are for reference reasons only and for indicating item use and compatibility. Our business and the outlined substitution parts contained herein are not sponsored, approved, or created by the OEM.